Most FPUs - Floating Production Units - are FPSOs - Floating Production Storage & Offloading units but you could also say that there is Fearfully Poor Safety Offshore! An FPSO receives live crude from the sea floor, kills it in a topside production installation that sends the dead crude to storage tanks in the hull of the FPSO - the bottom side. Later the crude is offloaded to shuttle tankers at regular intervals.
The SOLAS IG system may protect the tanks against fire, but if the deck pipe system is dangerous when you try to gas free the tank, then something is wrong. There are many instances that leaking valves in approved IG systems prevent proper purging, may cause flammable gas leaks when gas freeing and do not ensure safety against gas leaks when inside the tank. The result is that unit staff spades all lines under a Permit to Work system just in order to get into the tank. Heiwa Co proposes that the IG deck pipe system on an FPSO, that should become industry standard, shall look as follows: Full details are found in a paper given by Heiwa Co at the International Conference Design & Construction of Floating Production Units, 3 April 2007, Singapore. You can read it here! Contact anders.bjorkman@wanadoo.fr
|